These pages show the progress each month during the sixth year and beyond
Month 63: Cleaning, refurbishing, polishing and painting the dashboard and its components, Straightening and chroming of the bumpers and hood hinges, repair of the door latches and painting of the body.
Month 68: Cleaning and polishing the steering column controls, painting the steering wheel, assembly of bumpers and installation of Fatmat.
Month 71: Rewiring the entire car from scratch, new gas tank bottom and sealer, dashboard assembly and details.
Month 78: Accumulation of final touches over a couple of months, mounting tires, polishing, installing glass, LED lights, mirrors, and trim. Photos of it almost finished.
Finishing touches: all the little things that dragged out waiting on parts or time, not being in a hurry as the paperwork still is not straightened out for the tags. Here we have some final pictures of the exterior around the neighborhood.
Month 68: Cleaning and polishing the steering column controls, painting the steering wheel, assembly of bumpers and installation of Fatmat.
Month 71: Rewiring the entire car from scratch, new gas tank bottom and sealer, dashboard assembly and details.
Month 78: Accumulation of final touches over a couple of months, mounting tires, polishing, installing glass, LED lights, mirrors, and trim. Photos of it almost finished.
Finishing touches: all the little things that dragged out waiting on parts or time, not being in a hurry as the paperwork still is not straightened out for the tags. Here we have some final pictures of the exterior around the neighborhood.